{"id":11247,"date":"2025-09-04T06:07:53","date_gmt":"2025-09-03T22:07:53","guid":{"rendered":"https:\/\/klhappenings.com\/?p=11247"},"modified":"2025-09-04T06:15:38","modified_gmt":"2025-09-03T22:15:38","slug":"samaiden-has-been-awarded-several-solar-power-plant-projects-to-advance-malaysias-clean-energy-goals","status":"publish","type":"post","link":"https:\/\/klhappenings.com\/?p=11247","title":{"rendered":"Samaiden has been awarded several solar power plant projects to advance Malaysia&#8217;s clean energy goals"},"content":{"rendered":"\n<p><em>99.99 MW Photovoltaic Plant in Johor to Supply Energy for 21 Years Under TNB Agreement<\/em><\/p>\n\n\n\n<p><strong>PETALING JAYA, <\/strong><strong>3 SEPTEMBER 2025 <\/strong>\u2013 <a href=\"https:\/\/samaiden.com.my\/\"><strong>Samaiden Group Berhad<\/strong><\/a><strong> <\/strong>(\u201cSamaiden\u201d or \u201cthe Company\u201d), a renewable energy (\u201cRE\u201d) specialist principally involved in development and engineering, procurement, construction and commissioning (\u201cEPCC\u201d) of RE systems and power plants, is pleased to announce that a consortium comprising its wholly-owned subsidiary, <strong>Samaiden Sdn. Bhd.<\/strong> (\u201cSSB\u201d) and <strong>JBB Builders (M) Sdn. Bhd.<\/strong> (\u201cthe Consortium\u201d), has received a <strong>Letter of Notification<\/strong> (\u201cLON\u201d) by the <strong>Energy Commission<\/strong> on 2 September 2025 for the development of a 99.99 Megawatts (\u201cMW\u201d) Large Scale Solar Photovoltaic Plant (\u201cLSS Plant\u201d) in Segamat, Johor. <strong>The achievement highlights Samaiden\u2019s unwavering commitment to driving the advancement of Malaysia\u2019s RE sector and contributing to the nation\u2019s energy transition goals.<\/strong><\/p>\n\n\n\n<p>The LON was issued on 2 September 2025, <strong>formally acknowledging the Consortium as a shortlisted bidder for the project under the Large-Scale Solar PETRA 5+ programme.<\/strong> The Consortium was selected under Package 3 (30 MW to 500 MW category) based on its competitive bid and fulfilment of the Request for Proposal criteria. The project further strengthens Samaiden\u2019s standing as a reliable provider of large-scale RE solutions.<\/p>\n\n\n\n<p>The LSS Plant, which will have a maximum export capacity of 99.99 MW, is set to contribute significantly to Malaysia\u2019s RE capacity. The project will operate under a 21-year Solar Purchase Agreement between Samaiden and <strong>Tenaga Nasional Berhad<\/strong>, ensuring a stable and long-term revenue stream. The plant is scheduled to achieve its Commercial Operation Date by 31 October 2027, marking the date when it will begin supplying electricity to the national power grid.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"435\" src=\"https:\/\/klhappenings.com\/wp-content\/uploads\/2025\/09\/3502951.webp\" alt=\"\" class=\"wp-image-11251\" style=\"width:240px;height:auto\" srcset=\"https:\/\/klhappenings.com\/wp-content\/uploads\/2025\/09\/3502951.webp 700w, https:\/\/klhappenings.com\/wp-content\/uploads\/2025\/09\/3502951-300x186.webp 300w, https:\/\/klhappenings.com\/wp-content\/uploads\/2025\/09\/3502951-676x420.webp 676w, https:\/\/klhappenings.com\/wp-content\/uploads\/2025\/09\/3502951-640x398.webp 640w, https:\/\/klhappenings.com\/wp-content\/uploads\/2025\/09\/3502951-681x423.webp 681w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption class=\"wp-element-caption\"><br>Datuk Ir. Chow Pui Hee, Group MD of Samaiden (<a href=\"https:\/\/drive.google.com\/drive\/folders\/16_fZ-IPEbjpzbJ1oroqp7qBd9-p9iZPB?usp=sharing\">Link<\/a>)<\/figcaption><\/figure>\n<\/div>\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><br><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Group Managing Director of Samaiden,<\/strong><strong> Datuk <\/strong><strong>Ir. Chow Pui Hee<\/strong> commented, \u201cBeing selected for this large-scale solar project is a significant milestone that reflects the market\u2019s confidence in Samaiden\u2019s capabilities and our continued commitment to supporting Malaysia\u2019s renewable energy ambitions. We are proud to play an active role in accelerating the nation\u2019s energy transition and delivering sustainable value for the long term.\u201d<\/p>\n\n\n\n<p>This announcement reinforces Samaiden\u2019s position as a leading force in the RE sector, demonstrating its proven capability to secure and deliver high-impact projects that contribute meaningfully to both national and global sustainability objectives. The project marks another strategic milestone in Samaiden\u2019s ongoing efforts to solidify its role as a key contributor to Malaysia\u2019s renewable energy landscape.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>99.99 MW Photovoltaic Plant in Johor to Supply Energy for 21 Years Under TNB Agreement PETALING JAYA, 3 SEPTEMBER 2025 \u2013 Samaiden Group Berhad (\u201cSamaiden\u201d or \u201cthe Company\u201d), a renewable energy (\u201cRE\u201d) specialist principally involved in development and engineering, procurement, construction and commissioning (\u201cEPCC\u201d) of RE systems and power plants, is pleased to announce that [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11248,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[890,10,3474],"tags":[3475,514],"class_list":["post-11247","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bursa-market","category-business","category-samaiden","tag-awarded-several-solar-power-plant-projects","tag-samaiden"],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/klhappenings.com\/wp-content\/uploads\/2025\/09\/Picture4.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/klhappenings.com\/index.php?rest_route=\/wp\/v2\/posts\/11247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/klhappenings.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/klhappenings.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/klhappenings.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/klhappenings.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11247"}],"version-history":[{"count":2,"href":"https:\/\/klhappenings.com\/index.php?rest_route=\/wp\/v2\/posts\/11247\/revisions"}],"predecessor-version":[{"id":11252,"href":"https:\/\/klhappenings.com\/index.php?rest_route=\/wp\/v2\/posts\/11247\/revisions\/11252"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/klhappenings.com\/index.php?rest_route=\/wp\/v2\/media\/11248"}],"wp:attachment":[{"href":"https:\/\/klhappenings.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11247"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/klhappenings.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11247"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/klhappenings.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}